Project introduction |
|
Project title : Construction of the Production Unit of FRP Rebar at Rimdan Border Crossing | |
Project Description : In the construction industry, FRP (Fiber Reinforced Polymer) composites have emerged as a viable alternative to traditional materials. These composites consist of a matrix of resin that holds together a network of strong fibers, providing excellent resistance and durability. The resin protects the fibers while distributing loads evenly along their length, offering structural integrity. |
|
Annual Capacity : The proposed annual production capacity for FRP rebars is 9,900 meters, equivalent to 4,000 tons. | |
Project status |
|
Access to raw materials : | |
Sales : | |
Construction period : | |
Project status : | |
Financial structure |
|
Fixed capital : 677,860,000,000 | Rate of return on capital : |
Working capital : 557,485,000,000 | Payback Period (PBP) : 4 |
Foreing currency required : | Net present value (NPV) : 175,952,000,000 |
Total investment : | |
Internal rate of return (IRR) : 30.7 | |
Other |
|
Type of the project : establishment | |
Legal structure of the company : governmental | |
|