Project introduction

Project title : Solar power plant
Project Description :

The geographic location of Chabahar, in terms of its proximity to the equator, and having 360 days of sunshine, has created a unique opportunity for  construction of solar industries. This project is intended for 400 megawatts of solar energy. The purpose of this project is to  from renewable sources. Currently, energy production is dependent on fossil fuels. This project is produce energy indicative of reducing greenhouse gases and thus protecting the environment. The project is intended to produce 400 MW of solar energy. Therefore, by using solar energy in this province, in addition to reducing the transmission and distribution costs, we can also help cleaning the environment. It should be noted that the electricity produced in accordance with the rules of the Renewable Energy Organization, can be bought by the government.

Annual Capacity : 400 MW (Minimum module 10 MW)

Project status

Access to raw materials : domestic 40% foreign 60%
Sales : domestic 100%
Construction period : 2 years
Project status :

Allocated land is 700 hectares. Useful lifetime for the implementation of the project is 20 years Feasibility studies have been carried out for this project.
Intended land  can be transferred to the investor in the form of long-term lease All required licenses will be  issued by CFZO
In this project, the CFZO  is ready to be in partnership with the investor
Infrastructure facilities (electricity, water, telecommunications, fuel, road etc.) have been provided.

Financial structure

Fixed capital : 1064997 million rials (4000 million rials for 10 MV module) Rate of return on capital : 30 %
Working capital : 18641.5 million rials Payback Period (PBP) : 5 years
Foreing currency required : Net present value (NPV) : 69123 million rials
Total investment : 1083638.5 million rials
Internal rate of return (IRR) : 36 %

Other

Type of the project : establishment
Legal structure of the company : non-governmental





Above mentioned figures are subject time of investment